You are using an outdated browser. Please upgrade your browser to improve your experience.

print article Print article
parkplatz, linz

Parking-Deck Canopy in Linz

High degree of prefabrication: a short film shows impressions of the extremely dense construction process

The structure consists of a steel framework with 15 rectangular fields measuring 11 x 18 m each; they were assembled to a great extent on the ground and hoisted to the exact height. Each field was then suspended from a column by 6 tension rods and 6 compression rods. The membranes arrived on site fashioned in a ring shape; prior to the assembly of the steel construction, the membranes were placed around the columns and were later drawn into place. After they were attached to the steel-frame construction with keder rails, the textile funnels were tightened with threaded rods. PVC-coated polyester fabric was selected for the outermost layer. The inner membrane hides the steel: The shadows cast on the membrane change over the course of a day and only hint at the actual structure’s appearance.

Architects: form,art, Graz


Parking-Deck Canopy in Linz

This article is taken out of the following magazine:
DETAIL 1+2/2009

Roofs (also available as English Edition 2/2009)

See magazine
Product teaser
Advertisement

ARCHITECTURE & DESIGN

Detail Newsletter

We will keep you informed about international projects, news on architectural and design topics, research and current events in our newsletter.