You are using an outdated browser. Please upgrade your browser to improve your experience.

print article Print article

Sludge Towers of Munich 1 Sewage Works

This sewage works, Munich’s second-largest producer of renewable energy, demonstrates that industrial architecture and good design need be no contradiction. In the almost 50-metre-high prestressed concrete containers, organic substances are removed from the sewage sludge, and energy is generated from the resultant biogas. Thermal losses are minimized to achieve an ideal digestion temperature of 37 °C. The central staircase tower and the four 32-metre bridges serve as access routes and gas distribution runs. Despite the complications of obtaining building permission and the construction process, which covered a period of almost 10 years, it was possible to adhere to the cost parameters of ? 63 million.
This article is taken out of the following magazine:
DETAIL 4/2009

Cost-Effective Buildings

See magazine
Product teaser
Advertisement

ARCHITECTURE & DESIGN

Detail Newsletter

We will keep you informed about international projects, news on architectural and design topics, research and current events in our newsletter.