You are using an outdated browser. Please upgrade your browser to improve your experience.

print article Print article
timber-frame building, timber construction, prefabrication

Sculptural Timber-frame Building

Ziegler, one of Europe’s largest sawmills, moved into its new company headquarters last year situated on a clearing in Plössberg in the Upper Palatinate. Brückner & Brückner Architekten from Tirschenreuth and Würzburg have planned the timber frame building with a curtain glass facade and shading screens. It was built within one year by timber construction manufacturer Holzbau Riedl.

The main support system consists of pendulum supports. It is braced with solid-wood ceiling panels and stabilised by escape staircases made of reinforced concrete. Vertical load transfer is provided by continuous endgrain contact from column to column. Around 200, mostly 19 m high, peeled, untreated spruce trunks, which are lined up vertically at clear intervals, enclose the building. Behind them is a post-and-beam construction made of wood and metal with insulating glazing. Enamelled, back-insulated glass panels are used in the area of the storey ceilings. A surrounding strip foundation overfilled with gravel bears the weight of the trunks, each of which weighs around 1,000 kg. The tree-trunk facade is further supported by steel struts, which are attached to the surrounding cantilevered wooden fascia.


For more information, see:
www.holzbau-riedl.de
www.zmh.com

This article is taken out of the following magazine:
DETAIL 5/2021
5/2021

Brickwork

See magazine
Product teaser
Advertisement

ARCHITECTURE & DESIGN

Detail Newsletter

We will keep you informed about international projects, news on architectural and design topics, research and current events in our newsletter.