You are using an outdated browser. Please upgrade your browser to improve your experience.

print article Print article
school, timber, module, Darmstadt, Mobispace

School Extension in Wooden Construction 

The Sabine-Ball School in Darmstadt combines an elementary school, secondary school and grammar school in one. In 2018, due to increasing student numbers, mobispace was awarded the contract for an ­expansion to the school in ­timber-frame construction. Local office werk.um Architekten was responsible for the planning. In the summer of 2019, prefabrication of the modules began at the factory. At the same time, the floor slab and supply lines were laid on the construction site. By the autumn of 2019, the elements had been assembled on site. Directly afterwards, installation of the building services and the interior work began. In May 2020, the new school building with a total GFA of 1720 m² was occupied.

For more information, see:
www.mobispace.de

school, timber, module, Darmstadt, Mobispace

Photo: Mobispace

This article is taken out of the following magazine:
DETAIL 9/2021
9/2021

Concept: Sports Facilities

See magazine
Product teaser
Advertisement

ARCHITECTURE & DESIGN

Detail Newsletter

We will keep you informed about international projects, news on architectural and design topics, research and current events in our newsletter.