You are using an outdated browser. Please upgrade your browser to improve your experience.

print article Print article

Modular Construction Without a Fixed Pattern by ADK Modulraum

Following its expansion, the Business Club now offers space for 600 more guests. The new building wing, as well as the existing VIP area, have been realised by ADK in a hybrid modular design. The special feature of this project is its largely column-free nature. Only three supports were required for the total area of almost 900 m2. The front-sloping facade posed no problem for the modern, modular design. Approximately 90% of the technical equipment and furnishings for the expansion of the VIP area was prefabricated in the factory. As a result, regular match and training operations could continue undisturbed. The entire construction period was six months. 16 room modules were delivered from the ADK plant to the Voith Arena in Heidenheim. At 19 metres long, 6.10 metres wide and just under 6 metres high, these were the largest-ever modules to be transported by road in Europe.

www.adk.info

Kurze Werbepause

Construction, ADK Modulraum, Modular construction, hybrid construction

Photo: Manufacturer

This article is taken out of the following magazine:
DETAIL 4/2018
DETAIL 4/2018, Kostengünstiger Wohnungsbau

Cost-Effective Housing

See magazine
Product teaser
Advertisement

ARCHITECTURE & DESIGN

Detail Newsletter

We will keep you informed about international projects, news on architectural and design topics, research and current events in our newsletter.