You are using an outdated browser. Please upgrade your browser to improve your experience.

print article Print article

Low-emission floors and ceilings by Lindner Group

In the immediate vicinity of a lake, an office building called Seeparkcampus West has been built with space for 330 workplaces and a large service area. Inside the wood-hybrid building, built by Handler Bau GmbH, the aim was to create a healthy working environment for the employees and as many visual references to the exterior as possible. Lindner GmbH participated in the project with dry construction work in the form of low-emission ceiling and floor systems, using Plafotherm heating and cooling ceilings and the cradle-to-cradle certified LMD metal ceiling system. The Austrian subsidiary of the Lindner Group supplied the Nortec raised flooring system, which is recommen­ded for construction use for en­vironmental reasons and is also C2C-certified, as well as the joint­less Cavopex cavity flooring system, which is made of non-combustible calcium sulphate and offers good sound insulation.

www.lindner-group.com

Kurze Werbepause

interior construction, Lindner Group, ceiling, low-emission, floors, Seeparkcampus West, Erich Reismann

Photo: Erich Reismann

This article is taken out of the following magazine:
DETAIL 1+2/2018
Timber construction, DETAIL 1+2/2018

Timber construction

See magazine
Product teaser
Advertisement

ARCHITECTURE & DESIGN

Detail Newsletter

We will keep you informed about international projects, news on architectural and design topics, research and current events in our newsletter.